Waltham Point, Waltham Abbey
Waltham Abbey
Construction of a 600m by 100m double truss steel construction distribution warehouse for Sainsbury’s. Works include major earthworks cut and fill grading, Soil stabilisation of 20 hectares, CFA piling, contiguous piled retaining wall, Gabion retaining wall, reinforced earth retaining wall, structural steel frame, roof and wall cladding, drainage works, underground services, fibre reinforced internal concrete slabs, air entrained external concrete slabs and pre-cast concrete dock levellers.
Construction of a 600m by 100m double truss steel construction distribution warehouse for Sainsbury’s. Works include major earthworks cut and fill grading, Soil stabilisation of 20 hectares, CFA piling, contiguous piled retaining wall, Gabion retaining wall, reinforced earth retaining wall, structural steel frame, roof and wall cladding, drainage works, underground services, fibre reinforced internal concrete slabs, air entrained external concrete slabs and pre-cast concrete dock levellers.
Project Details
- ClientKIER
- Value£30.00M
- CompletedSeptember 2002
- ServicesIndustrial
- StatusCompleted
Explore Other Projects

Leigh Street, High Wycombe
Conversion of an existing mill building and construction of 4 new buildings on a...
View Details →
North London Grammar School; Colindale
Conversion of existing office building to an independent school with 450 pupil c...
View Details →
Colne Valley Retail Park, Watford
Diversion of approximately 500 linear meters of medium pressure 450mm dia gas ma...
View Details →